Subfloor Prep is the Key!

Make sure your contractor knows what they are doing with your Materials!


Clean & Level Subfloor

+

Appropriate Adhesives and procedures

=

A Sound and Warrantable Installation



Last week I attended a 3 day class at the NWFA Training Center in St. Louis.  We learned to troubleshoot many scenarios that leave alot of flooring installers scratching their heads.  Whether it is a solid concrete floor, radiant heat installation or a combination of plywood and concrete; we have the methodology to tackle any problem and make it right!